22-4 (DURING) Floor Reno 2018 - 687 HDB
On day of Reno, before they hacked...
@687B
12 March 2018 monday
-----------------------------------
During Reno
12 March 2018 - 24 March 2018
12 march 2018 Monday
hacking the floors, removing old tiles
Video of tile demolish/hacking
(insert here)
-------------------------------
13 March 2018 Tues
- (i was working, had class)
they started laying tiles
-------------------------------
14 March 2018 Wed
Video of Tile Laying
(insert video here)
Slanting and Sloping Floors 😱😱
We reached the flat at about 11.45am. they said they have already laid about 5 rows since they started work this morning (at around 9am). Most tiles have already been laid when i arrived.
but as i looked at the new flooring...
the floor looked as if it's tilted! the left side of floor rises to a higher level and centre of room is of lower level. the floor then slopes upwards from the centre towards the right. the 2 slopes seem to meet at the position where the old tiles popped up! omg 😱😱😱
or could it be my bad eyesight?
below - new tiles just laid since tues.... pics taken 14 march 2018 wed
materials used
tiles from Hafary FML6871
Adhesive - contractor says this uses some acid to help the cement bind. should be stronger than what contractors used 10 years ago. (i think previous contractor mixed sand with cement for the tiling work.)
they tell me that it takes about 3-4 hours for the cement-adhesive to dry.