43-14 JAMIE'S HDB - HANDOVER (ANDREAS & WIFE) AND PREPARING FOR NEW TENANT (ANTONIO & ERIN.Tan) - 24 OCT - 14 NOV 2025

* Handover from Andres and Wife (24 Oct 2025) 
* Prep for New Tenant -Antonio and Erin Tan - Singapore
* New tenant handover 14 Nov 2025


Handover (ANDREAS) - 24 Oct 2025
24 Oct 2025
took pics but not enough to document the flat after handover.

below: storeroom - to clear, tiles to keep in storeroom

below: 1 Nov 2025 - storeroom cleared

below: kitchen fan not working

below: toilet ceiling - some peeling, uggh

below: window grills - where is the key?

below:
toilet roll tube missing or spoilt
common bedroom - ceiling light bulb blown


Things to do for next tenant:
before 14 Nov 2025

1. living room furniture

A- buy new 3 seater sofa set + stool - fortytwo - done
- delivery and install - 1/11, 12-3pm
- replace torn sofa - 5/11, 2-4pm

B- buy and install coffee table - IKEA
- bought - 1/11  
- coffee table fixed by christen - 2/11

2. find key for all window grills - done
3. replace toilet paper spool rod x2 - done

4. clean up spill in freezer - done
(new fridge left behind by Andreas and wife)

5. PRISM - Aircon and Ceiling Fan
ceiling fan installed - 27 Sep 2025
receipts for aircon servicing under PRISM - done
aircon - installed - 18 March 2025
a/c servicing 1 - 13 June 2025
a/c servicing 2 - 19 Sep 2025
a/c servicing 3 - dec 2025 - tbc

6. storeroom
- tiles to shift to storeroom
- clear storeroom - throw microwave, clock, earpiece, etc
7. new water heater - master bedroom 
- bought 3/3/2025, 
- installed 4/3/2025
- 27 Nov 2025 - Mr Gan - replaced broken tap with with stock cock

8. clean house - no need
tenant moving in 2 weeks earlier as they are travelling overseas for work

9. arrange with brian to do some works - done
BRIAN - works done - 7 Nov to 12 Nov 2025


----------------------------------------------------------
BRIAN - works - 7 Nov to 12 Nov 2025

1. purchase and replace kitchen wall fan -- $70
2. common bedroom - fix door stopper -- $30

3. electrical works
 
a. purchase and replace ceiling lights to LED lights x5 -- $550
LED 60W white lights, 6500k, round design
- living room x2
- kitchen x2
- common bedroom x1

b. replace living room light switches are loose x2 -- $80

c. remove one lamp on cable lights -- FOC
d. remove common bedroom wall light -- FOC
- remove existing flourescent tube lamp on wall

4. whole hdb flat - apply oil sealant and paint -- $2,600
- ceiling - Nippon martex
- walls - Nippon vinilex white 5048
- door frames x3 and door oil base paint (glossy)
- water pipes x2 -- FOC
- putty and silicon areas (walls, ceiling, common bedroom) -- FOC

5. master bedroom - cover hole in wall -- $180
- supply, install board to seal hole in the wall 

6. misc -- FOC
- remove front/entrance door stickers
- add silicon sealant to wooden wall board in common bedroom
- add silicon sealant for wood plank in master bedroom to cover wall hole

----------------------------------------------------------
27 Nov 2025
master bathroom - fix water heater - $100 Mr Gan

below - left pic - leak area
right pic - fixed with stopcock

----------------------------------------------------------
3 Nov 2025


----------------------------------------------------------
2 Nov 2025
furniture - 3 seater sofa, stool and coffee table - done!
window grills - checked - key left in kitchen window grill





christen fixing the coffeetable...

----------------------------------------------------------
1 Nov 2025
check window grill - where are the keys?
buy coffee table from IKEA


below: master bedroom - throw mattress? 
14 Nov 2025 handover - no, don't throw
25 Dec 2025 - throw mattress










26 Oct 2025
ordered 3 seater sofa with stool


----------------------------------------------------------
below: master bedroom - hole in the wall! seal?



----------------------------------------------------------
below: new fridge - cleaned the freezer (liquid spill)

----------------------------------------------------------
below: common bedroom - wall to tidy up
below: common bedroom - wall light to remove, to paint wall and ceiling

----------------------------------------------------------
below: replaced toilet paper roll tube
----------------------------------------------------------
below: threw microwave, ear piece

----------------------------------------------------------
7-12 Nov 2025
below: photos when working with brian to fix and work on hdb flat
















----------------------------------------------------------
HDB for Jamie

update 26 oct 2018
504 #05 - 295k
neg to 290k
valuation 290k - nov2018

(ownership) signed with HDB - 15 April 2019
MOP 5 years - till 15 April 2024
(MOP = minimum occupation period)

notes: 
-flat bought apr 2018 @$290k (Valuation Price)
-flat TOP 1980 (41 years old as at year 2021)
-Tenant 1 - Edwin and Wife - Apr/May 2018 to 2 June 2020
-Tenant 2 - Bob - 16 june 2020 till 8 Oct 2023
-Tenant 3 - Andreas and Wife - 1 Dec 2023 - 31 Oct 2025
-Tenant 4 - Antonio Tjeng and Wife, Erin Tan - 15 Nov 2025 - onwards
(waiting 2-3 years for BTO Flat)

----------------------------------------------------------
Jamie's HDB Links

43-1 house hunting
https://jt-write.blogspot.com/2018/09/43-jamie-hdb.html

43-2 house cleaning 2019
https://jt-write.blogspot.com/2020/06/43-3-jamies-hdb-2020-handover-house.html

43-4 Service Aircon, Repairs, Inventory - Storeroom & bedrooms jun2020
Cabinets with Tiles Along Corridor Nov2020

43-9 Jamie's HDB 2021 - Toilet Ceiling Leaks 
& Master Bedroom Wall - from Jan2021

43-10 Jamie's HDB 2021 - Fridge door rubber seal is detached -Aug 2021

43-11 Jamie's HDB 2021 - DB BOX - Trip

43-12 Jamie's HDB 2023 - Tenant Handover, Prepare for Next Tenant (Andreas) - Oct 2023

43-13 Jamie's HDB - Clear Jamie's Bedroom - Tenant Andreas & Wife - Sep/Oct 2024

43-14 Jamie's HDB - Handover (Andreas and Wife) + Prepare for New Tenant (Antonio and Erin) - 24 Oct to 14 Nov 2025
https://jt-write.blogspot.com/2025/12/43-14-jamies-hdb-handover-andreas-wife.html 

Comments